Treatment Of Polyester Yarn Dyeing Wastewater

HANGZHOU FENGYI TEXTILE CO.,LTD | Updated: Aug 11, 2017

               Compared with the actual operation of wastewater treatment in polyester dyeing industry, the biochemical-physicochemical two-stage process can meet the requirements of discharge. When the main pollutant codcr884mg/l,BOD5120MG/L, BOD5/CODCR is only 0.12 ~ 0.16, after biochemical-physicochemical two-stage treatment of its effluent quality codcr<100mg/l.Polyester Yarn

               The chemical fiber fabric dyeing and finishing wastewater has poor biodegradability, so the wastewater treatment has some difficulty. Dyeing wastewater of polyester yarn with disperse dyes as main dyeing agent is a typical dyeing and finishing wastewater of chemical fiber fabric. In the process of treatment of wastewater in Ningbo polyester yarn dyeing industry, different technological processes have been adopted, and the wastewater treatment process, which is mainly biochemical and physicochemical two, has been gradually formed, and good social and environmental benefits have been achieved. This paper briefly introduces the treatment of polyester yarn dyeing wastewater by biochemical-physicochemical treatment technology.Polyester Yarn

               A series of tests based on water quality determine the biochemical-physical treatment process as shown in Fig. 1. After the production waste water from the dyeing workshop is pumped into the regulating pool homogeneous quantity, the water temperature is lowered from 75 ℃ to 55 ℃ by the A-stage cooling tower to the middle pool, and the middle water pump is upgraded from intermediate pump to two-stage cooling tower to reduce the water temperature further to 45 ℃ into the A-stage sedimentation tank to the anaerobic tank, after anaerobic and biochemical wastewater enters aerobic tank biodegradation, it is discharged from the dosing reaction pool after coagulation and sedimentation into ph and after adjustment.Polyester Yarn

              Successively carried on biochemistry and materialization debugging. The effluent is adjusted ph to 8 in the middle of the water tank. $number, control of wastewater temperature 45℃~55℃ into the biochemical pool. The biochemical anaerobic tank was used as the carrier of soft filler, and the thermophilic anaerobic biological culture was carried out by adding anaerobic sludge and nutritive material. The continuous dynamic culture method was used in the biofilm culture of biochemical aerobic pond, which could reach the stable removal rate in about one weeks, the biological phase in biofilm was mainly paramecium, Bell worm, rotifer and Straw worm, and was distributed vertically in the push-flow oxidation tank. In the oxidation tank, the YDT elastic filler is used as the biofilm carrier, the perforated tube aeration is adopted to control the dissolved oxygen in 2mg/l~4mg/l. From the angle of economy, technology, stability and operability, the physical and chemical debugging phase compares the practical performance of various coagulant, and makes a series of experiments, such as the dosing of flocculant, the ph control of sewage and the operation load of sedimentation tank, to determine the best physicochemical operation process. The entire commissioning process from the anaerobic tank to the stable discharge of emissions for a total duration of about 2 months.Polyester Yarn

HANGZHOU FENGYI TEXTILE CO.,LTD

Add:NO.212 YAQIAN ROAD,YAQIAN TOWN,XIAOSHAN,HANGZHOU,CHINA

Contact us:DORIS DING

Tel:+86-571-83717108

Fax:+86-571-83717108

Mob:+8618668232609

E-mail:dorisding81@fypolyester.com